[1] 曹晋华,程侃.服务台可修的M/G/1排队系统分析.应用数学学报,1982,5(2):113-127 Cao J H,Cheng K.Analysis of M/G/1 queueing system with repairable service station.Acta Mathematicae Applicatae Sinica,1982,5(2):113-127 [2] 唐应辉.服务台可修的M/G/1排队系统的进一步分析.系统工程理论与实践,1996,16(4):45-51 Tang Y H.Further analysis of M/G/1 queueing system with repairable service station.Systems Engineering-Theory&Practice,1996,16(4):45-51 [3] Tang Y H.A single-server M/G/1 queueing system subject to breakdowns:Some reliability and queueing problems.Microelectronics Reliability,1997,37(2):315-321 [4] Li W,Shi D H,Chao X L.Reliability analysis of M/G/1 queuing systems with server breakdowns and vacations.Journal of Applied Probability,1997,34(2):546-555 [5] Tang Y H.Some reliability problems arising in GI/G/1 queueing system with repairable service station.Microelectronics Reliability,1995,35(4):707-712 [6] 唐应辉,唐小我.推广的MX/G(M/G)/1(M/G)可修排队系统(Ⅱ)--一些可靠性指标.系统工程理论与实践,2000,20(2):84-91 Tang Y H,Tang X W.The generalized MX/G(M/G)/1(M/G) repairable queueing system(Ⅱ)--Some reliability indices.Systems Engineering-Theory&Practice,2000,20(2):84-91 [7] 唐应辉,唐小我,赵玮.单重延误休假MX/G(M/G)/1可修排队系统分析(I).系统工程理论与实践,2000,20(1):41-50 Tang Y H,Tang X W,Zhao W.Analysis of the MX/G(M/G)/1 repairable queueing system with single delay vacation(I).Systems Engineering-Theory&Practice,2000,20(1):41-50 [8] Tang Y H.Some reliability problems arising in the MX/G(M/G)/1 repairable queueing system with single delay vacation.Journal of Systems Science and Systems Engineering,2001,10(3):306-314 [9] 唐应辉,赵玮.可修排队系统可靠性指标的分解特性.运筹学学报,2004,8(4):73-84 Tang Y H,Zhao W.The decomposition properties of reliability indices in repairable queueing systems.Operations Research Transactions,2004,8(4):73-84 [10] 魏瑛源,唐应辉.N个不同部件串联而成的M/G/1可修排队系统.系统工程理论与实践,2004,24(11):106-110 Wei Y Y,Tang Y H.M/G/1 repairable queueing system with N units series structure.Systems Engineering-Theory&Practice,2004,24(11):106-110 [11] 余玅妙,唐应辉.多级适应性延误休假MX/G(M/G)/1可修排队系统的可靠性指标.运筹学学报,2008,12(3):103-112 Yu M M,Tang Y H.Some reliability indices in MX/G(M/G)/1 repairable queueing system with adaptive multistate delay vacation.Operations Research Transactions,2008,12(3):103-112 [12] 唐应辉,李才良,黄蜀娟,云曦.延误多重休假离散时间GeomX/G/1可修排队系统的可靠性指标.系统工程理论与实践,2009,29(4):135-143 Tang Y H,Li C L,Huang S J,Yun X.Some reliability indices in discrete time GeomX/G/1 repairable queueing system with delay multiple vacations.Systems Engineering-Theory&Practice,2009,29(4):135-143 [13] 唐应辉,余玅妙,付永红.Geom/G1,G2(Geom/G)/1/1可修Erlang消失系统的可靠性指标及其计算机仿真分析.系统工程理论与实践,2010,30(2):347-355 Tang Y H,Yu M M,Fu Y H.Reliability indices of Geom/G1,G2(Geom/G)/1/1 repairable Erlang loss system and computer simulation analysis.Systems Engineering-Theory&Practice,2010,30(2):347-355 [14] Tang Y H,Yu M M,Li C L.Geom/G1,G2/1/1 repairable Erlang loss system with catastrophe and second optional service.Journal of Systems Science and Complexity,2011,24(3):554-564 [15] 刘云颇,唐应辉.多重休假中以概率p进入的M/G/1可修排队系统.系统工程学报,2011,26(5):718-723 Liu Y P,Tang Y H.M/G/1 repairable queueing system with p-entering discipline during server vacations.Journal of Systems Engineering,2011,26(5):718-723 [16] Tang Y H,Yu M M,Yun X,Huang S J.Reliability indices of discrete-time GeoX/G/1 queueing system with unreliable service station and multiple adaptive delayed vacations.Journal of Systems Science and Complexity,2012,25(6):1122-1135 [17] 唐应辉,冯慧侠,吴文青.修理设备可更换的M/G/1可修排队系统分析.系统工程学报,2013,28(6):830-838 Tang Y H,Feng H X,Wu W Q.Analysis of M/G/1 repairable queueing system with a replaceable repair facility.Journal of Systems Engineering,2013,28(6):830-838 [18] 刘金银,唐应辉,朱亚丽,余玅妙.具有温储备失效和延迟修理的M/G/1可修排队系统的可靠性指标.系统工程理论与实践,2015,35(2):413-423 Liu J Y,Tang Y H,Zhu Y L,Yu M M.Reliability indices of M/G/1 repairable queueing system with warm standby failure and delayed repair.Systems Engineering-Theory&Practice,2015,35(2):413-423 [19] 刘仁彬,唐应辉.一类休假的GeoX/G/1可修排队的可靠性分析.系统工程理论与实践,2015,35(9):2354-2363 Liu R B,Tang Y H.Reliability analysis of a kind of GeoX/G/1 repairable queue with vacation.Systems Engineering-Theory&Practice,2015,35(9):2354-2363 [20] 吴锦标,尹小玲,刘再明.具有N-策略和负顾客的反馈抢占型的M/G/1重试可修排队系统.应用数学学报,2009,32(2):232-335 Wu J B,Yin X L,Liu Z M.The M/G/1 retrial G-queues with N-policy,Feedback,Preemptive Resume and Unreliable Server.Acta Mathematicae Applicatae Sinica,2009,32(2):232-335 [21] 唐应辉,朱亚丽,吴文青.修理设备可更换的N-策略M/G/1可修排队系统分析.系统工程理论与实践,2014,34(3):746-754 Tang Y H,Zhu Y L,Wu W Q.Analysis of M/G/1 repairable queueing system with N-policy and a replaceable repair facility.Systems Engineering-Theory&Practice,2014,34(3):746-754 [22] Wu W Q,Tang Y H,Yu M M.Analysis of an M/G/1 queue with multiple vacations,N-policy,unreliable service station and repair facility failures.International Journal of Supply and Operations Management,2014,1(1):1-19 [23] Wu W Q,Tang Y H,Yu M M.Analysis of an M/G/1 queue with N-policy,single vacation,unreliable service station and replaceable repair facility.Operational Research Society of India,2015,DOI:10.1007/s12597-015-0201-1 [24] Lee H W,Seo W J.Control policies of an M/G/1 queue under the dyadic Min(N,D)-policy and its cost optimization.Performance Evaluation,2008,65(10):742-758 [25] 魏瑛源,唐应辉,余玅妙.基于Min(N,D)-策略的M/G/1排队系统的队长分布及最优策略.系统科学与数学,2015,35(6):729-744 Wei Y Y,Tang Y H,Yu M M.Queue length distribution and optimal policy for M/G/1 queueing system under Min(N,D)-policy.Journal of Systems Science and Mathematical Sciences,2015,35(6):729-744 [26] 唐应辉,吴文青,刘云颇,刘晓云.基于多重休假的Min(N,V)-策略M/G/1排队系统的队长分布.系统工程理论与实践,2014,34(6):1533-1546 Tang Y H,Wu W Q,Liu Y P,Liu X Y.Queue length distribution of M/G/1 queueing system with Min(N,V)-policy based on multiple server vacations.Systems Engineering-Theory&Practice,2014,34(6):1533-1546 [27] 唐应辉,吴文青,刘云颇.基于单重休假的Min(N,V)-策略M/G/1排队系统分析.应用数学学报,2014,37(6):976-995 Tang Y H,Wu W Q,Liu Y P.Analysis of M/G/1 Queueing system with Min(N,V)-policy based on single server vacation.Acta Mathematicae Applicatae Sinica,2014,37(6):976-995 [28] 兰绍军,唐应辉.具有多重休假和Min(N,V)-策略控制的Geo/G/1离散时间排队.系统工程理论与实践,2015,35(3):799-810 Lan S J,Tang Y H.Geo/G/1 discrete-time queue with multiple server vacations and Min(N,V)-policy.Systems Engineering-Theory&Practice,2015,35(3):799-810 [29] 唐应辉,唐小我.排队论-基础与分析技术.北京:科学出版社,2006 Tang Y H,Tang X W.Queueing Theory:Foundations and Analysis Techniques.Beijing:Science Press,2006 [30] 曹晋华,程侃.可靠性数学引论.北京:科学出版社,1986 Cao J H,Cheng K.Introduction to Reliability Mathematics.Beijing:Science Press,1986 [31] Ross S M.Stochastic Processes.New York:Wiley,1996 |